Sealed Battery - Malaguti SPIDER MAX GT 500 Manual Diagnóstico

Tabla de contenido

Publicidad

SPIDER MAX 500

17. SEALED BATTERY

17.1 Sealed battery
The service operations simply concern the checking and recharging of the battery, when necessary.
These operations must be performed at the pre-delivery stage and every 6 months in case the motorcycle is
stored with the circuit open.
Besides pre-delivery checks, it is then necessary to check for the battery charge and to recharge it before storing
the motorcycle and then every 6 months.
"RENEWAL" RECHARGE AFTER STORING THE MOTORCYCLE WITH OPEN CIRCUIT
1) Voltage check
Before fitting the battery to the motorcycle, check the open circuit voltage by means of a common multimeter.
• In case the voltage is above 12,6 V, fit the battery without recharging it.
• In case the voltage is below 12,6 V, the battery needs a "renewal" recharge. Proceed as follows:
2) Using a constant-voltage battery recharger.
- Recharge at constant voltage equal to 14,40 ÷ 14,70V;
- Initial recharge current = 0,3 ÷ 0,5 x rated capacity;
- Duration of recharge:
Suggested 10 ÷ 12 h;
Minimum 6 h;
Maximum 24 h.
3) Using a constant-current battery recharger.
- Recharge current equal to 1/10 of the battery rated capacity.
All manuals and user guides at all-guides.com
23
12/04
A

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido