Descargar Imprimir esta página

Inspection Date; Resistance Test Reference; Peak Voltage Out Put Test Reference - TOHATSU EverRun MX50D2 Manual De Servicio

Ocultar thumbs Ver también para EverRun MX50D2:

Publicidad

Electrical System

4. Inspection date

Resistance test reference

Ignition coil
Pulser Coil
Exciter Coil

Peak voltage out put test reference

Pulser Coil
Exciter Coil
C.D unit
8-10
All manuals and user guides at all-guides.com
6) Measure peak voltage at engine cranking or engine
starting.
Primary
Secondary
L/W - B #1
WB - B #2
WR - B #3
W/G - B
Or - B
Or - W/G
L/W - B #1
WB - B #2
WR - B #3
Or - W/G
B/W - B
B/R - B
B/G - B
• When measuring peak voltage at engine
cranking, remove spark plug cap from spark
plug and spark plug is attached.
• Variation occurs in output value with cranking
speed.
• For manual start model:
Cranking speed is unstable, cranking
measurement makes reference value.
• Because numerical value of the data of each
model statement page is the lower limit, if it is
above this, as for good condition.
• The faulty part it specifies, input voltage being
properly, if there is a unit whose output voltage
is not properly that is the faulty part.
0.4 ~ 0.6Ω
6.8 ~ 10.2 kΩ
160 ~ 220Ω
160 ~ 220Ω
160 ~ 220Ω
520 ~ 720Ω
Cranking
Idling
3V
7V
185V
210V
160V
180V
GB
1500r/min
19V
210V
180V
2st 50D2 2011

Publicidad

Capítulos

loading

Este manual también es adecuado para:

Everrun mwx 50d2