Dc-Kit1 With Dometic Ca1000 - Waeco ECL-76 Instrucciones De Montaje

Distribuidor de corriente de carga
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 106
Connection
NOTE
I
 The fuse in the positive lead from the charging current distributor to the
battery can only be omitted if the lead is very short and will not come into con-
tact with metal.
 To connect the inverters in the scope of delivery of the DC kits, please refer
to the documentation accompanying the equipment.
PerfectPower PP1000 and PP2002
➤ Join the 230-V connector of the air conditioner to the PerfectPower PP1000/
PP2002 inverter.
SinePower SP1500
➤ Join the 230-V connector of the air conditioner to the connector provided on the
VS-230-2 priority circuit and, in turn, connect this to the SinePower SP1500 inverter
(item no. MSK1500-012).
NOTE
I
The remote controls for switching the inverters on and off must be connected in
accordance with the enclosed instructions and the relevant circuit diagram (see
pages fig. 1, page 3 to fig. b, page 14).
7.1

DC-Kit1 with Dometic CA1000

 Roof air conditioner: Dometic CA1000
 Circuit diagram: fig. 1, page 3
 Charging current distributor: ECL-76
 Inverter: PerfectPower PP1002
➤ Install inverter remote control C (membrane button) in an easily-accessible place and
connect its cable to the inverter.
NOTE
I
Observe also the instructions in the scope of delivery of the sensing cable.
➤ Remove the CA1000's outlet panel.
➤ Insert the three-pole plug of the sensing cable into the socket (3-pole pin strip socket)
on the control PCB of the air conditioner (fig. f, page 17).
➤ Link the ECL-76 to the air conditioner using the two-wire on/off cable (sensing cable,
item no. 4441300084).
➤ Set the AC/DC switching parameters for the air conditioner to "02" ( installation
manual for the CA1000, "Configuring the system software").
68
ECL-76, ECL-102
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecl-102

Tabla de contenido