Commissioning
5
Commissioning
5.1
Unpacking the incubator
18 / 82
■
Ventilation openings may not be covered or blocked.
■
Before commissioning, check to make sure the mains voltage is
correct according to the nameplate and that the mains cable is
connected properly.
■
If necessary, additional devices and accessories can be mounted
and/or connected.
Every time before using the incubator, make sure that
■
the incubator is dry.
When lifting the incubator, bear in mind its specified
weight and only lift it with an appropriate number of
helpers to prevent injury.
Please check the device and the outer packaging
before unpacking. Report any transport damage
immediately.
1.
Remove the packaging straps.
2.
The packaging can be easily removed, even in
rooms with a low ceiling. If handled carefully,
the packaging can be reused.
Remove the packaging.
Unloading from the pallet
WARNING
There is a risk of toppling when the incubator is taken
off the transport pallet.
There is a risk of the incubator toppling over. Persons
could be injured if the incubator topples over.
−
The instructions in this manual must be observed.
02.2023 / Rev. --
AB69601en