Descargar Imprimir esta página

WEG UPS 10 kVA Serie Manual Del Usuario página 19

Publicidad

Idiomas disponibles

Idiomas disponibles

General Information
Configuration: single-phase input - single-phase output
Distribution board
D
A
B
C
Configuration: three-phase input - single-phase output
Distribution board
D
A
Before connecting the UPS, it is necessary:
Make sure that the mains voltage and frequency match the information indicated on the
equipment label, according to
voltage, operating frequency, etc.).
Make sure the system ground connection is in full compliance with the requirements of NBR,
IEC, or other local standards.
Then, install the four-pole circuit breakers in compliance with the regulations in force, with
Curve C, as shown in
The control devices and all power connections of the equipment must be able to withstand
permanently the current indicated in
2.6 on page
14, according to the configuration used on the equipment.
13 | Enterprise
F, N
F, N
F, N
B
R, S, T, N
C
Figure 2.5: Possible input/output configurations of the UPS
Section 2.6 UPS IDENTIFICATION LABEL on page 9
Figure 2.5 on page
13.
Table 2.4 on page
Manual bypass
DJBP
DJER
INV.
PFC
DJE
Pos.
Neg.
FBAT
Neutral
Battery bank
Manual bypass
DJBP
DJER
INV.
PFC
DJE
Pos.
Neg.
FBAT
Neutral
Battery bank
14,
Table 2.5 on page 14
F, N
Static
switch
DJS
UPS
F, N
Static
switch
DJS
UPS
(input
and
Table

Publicidad

loading