Descargar Imprimir esta página

WEG UPS 10 kVA Serie Manual Del Usuario página 46

Publicidad

Idiomas disponibles

Idiomas disponibles

UPS Enterprise Parallelism Procedure
5.1.1 Battery Connection Layout
The batteries of the parallel system must be connected using a single battery bank for all UPSs,
according to
Figure 5.3 on page
time of the system in case a device is not in operation, either for failure or maintenance.
R, S, T, N
Reserve
R, S, T, N
Mains
Figure 5.2: One-line diagram of a parallel system using a single battery bank
5.2 INSPECTION OF THE ELECTRICAL CONNECTIONS
The sequence of procedures contained in this chapter must be followed before connecting
the optical fibers.
When the whole system de-energized (all switches in the OFF position), check that the phase
sequence is correct
(Figure 5.3 on page
Mains
Res.
Mains
line
line
line
DJER
DJE
DJE
DJBP
UPS1
Manual
Bypass
DJS
DJS
Output
Output
Figure 5.3: Position of switch-disconnectors when the system is completely off
40 | Enterprise
40. This configuration allows to maintain the same backup
External manual Bypass
Manual Bypass
Automatic Bypass
PFC
Pos.
Neg.
Neutral
Manual Bypass
Automatic Bypass
PFC
Pos.
Neg.
Neutral
Manual Bypass
Automatic Bypass
PFC
Pos.
Neg.
Neutral
40).
Res.
Mains
line
line
DJER
DJE
DJER
DJBP
UPS2
UPSn
Manual
Bypass
DJS
Output
s.sw.
INV.
UPS1
s.sw.
INV.
UPS2
s.sw.
INV.
UPS..N
Res.
Mains line
Reserve
line
OFF
DJBP
Mains line
Reserve
Manual
Bypass
OFF
R, S, T, N
Load
Battery bank
UPS 1
M-Bypass
Output
OFF
OFF
OFF
UPS 2
M-Bypass
Output
OFF
OFF
OFF

Publicidad

loading