Descargar Imprimir esta página

WEG UPS 10 kVA Serie Manual Del Usuario página 30

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation and Operation
The connect the external battery bank battery drawer connectors must follow the table below.
Table 3.2: Connection of external bank battery connectors (220V and 380V equipment)
For details of the connectors on the external battery bank, check the image below:
BANK 2
P13/P19
P14/P20
P15/P21
P13/P19
P14/P20
P15/P21
NOTE!
After connecting the batteries, make sure that the UPS battery fuses and
battery bank fuses are open, connect the cables from the terminals of the
battery cabinet to the UPS, observing the correct polarity.
24 | Enterprise
PX
PY
P1
P7
P2
P8
P3
P9
P4
P10
P5
P11
P6
P12
P13
P19
P14
P20
P15
P21
P16
P22
P17
P23
P18
P24
Figure 3.4: External battery bank connectors
BANK 1
P1/P7
P2/P8
P3/P9
P6/P12
P5/P11
P4/P10

Publicidad

loading