Descargar Imprimir esta página

WEG UPS 10 kVA Serie Manual Del Usuario página 43

Publicidad

Idiomas disponibles

Idiomas disponibles

4.2.4 Menu 3: UPS Commands
Using this menu, it is possible to control the UPS operation.
Message
3.1 System start
3.2 System stop
3.3 Switch the load
3.4 Start battery test
(*) Menu 3.5 is activated and can only be used by authorized personnel.
NOTE!
If the operator does not take any action for 3 minutes, menu "1. UPS STATUS
and ALARMS" is displayed automatically.
4.2.5 Menu 4: Panel Configuration
Message
4.1 Set date
4.2 Set time
4.3 Panel language
4.4 Alarm configuration
4.5 Setting of the battery test
NOTE!
If the operator does not take any action for 3 minutes, menu "1. UPS STATUS
and ALARMS" is displayed automatically.
4.2.6 Menu 5: Event Log Managements
In this menu, the user can view the last 1.023 events/alarms in chronological order.
The event log view can be opened by selecting 5. EVENT LOG in the main menu. The screen
will show the date and time of the last event. You browse the list using the <BACK or NEXT>
buttons. In all positions of the event list, pressing the MENU button will return the display to
the MAIN MENU.
NOTE!
If the operator does not take any action for 3 minutes, menu "1. UPS STATUS
and ALARMS" is displayed automatically.
Table 4.5: Commands enabled via HMI
With these commands, the user can turn the system on or off by pressing ENTER
With these commands, the user can transfer the load to the inverter or to the reserve
line by pressing ENTER
With this command, the user can start the battery test by pressing ENTER
Table 4.6: Possible settings via HMI
Used to set the actual date using the arrows to increase/decrease the numbers
Used to set the actual time using the arrows to increase/decrease the numbers
Used to select the display language among the available options
It allows the user to select hiding or viewing a recorded alarm until the ESC button is
pressed
Used to set the periodic battery test by selecting the day of the week, the number of
weeks between the tests and the time of the day to start the test
Meaning
Meaning
Control Panel
Enterprise | 37

Publicidad

loading