POWR
EXPLODED DIAGRAM
15 N • m (1.5 kgf • m, 11 ft • Ib)
6 × 14 mm
4
3
242
242
1
242
242
15 N • m (1.5 kgf • m, 11 ft • Ib)
6 × 30 mm
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
GENERATOR COVER
DISASSEMBLY
1
Bolt
2
Stator coil
3
Bolt
4
Cable holder
5
Bolt/washer
6
Bolt
7
Pickup coil
8
Generator cover
FLYWHEEL MAGNETO
2
5
7
6
242
242
5 N • m (0.5 kgf • m, 3.6 ft • Ib)
5 × 14 mm
Q'ty
Follow the left "Step" for disassembly.
3
1
2
NOTE:
1
This washer holds the pick-up coil lead.
1/1
Make sure to not pinch the lead between
1
the projection and the washer when
1
installing the bolt.
1
Reverse the disassembly steps for
assembly.
5-30
8
Service points
E