Descargar Imprimir esta página

Bearing, Intermediate Drive Shaft, And Grease Hose Inspection; Driven Coupling Inspection; Bearing Installation - Yamaha WaveRunner XLT800 Manual De Servicio

Ocultar thumbs Ver también para WaveRunner XLT800:

Publicidad

JET
PUMP
BEARING HOUSING
Bearing, intermediate drive shaft, and
grease hose inspection
1. Inspect:
Bearing
G
Rotate the inner race by hand.
Damage/rough movement → Replace.
Intermediate drive shaft
G
Damage/pitting → Replace.
Grease hose
G
Cracks/wear → Replace.

Driven coupling inspection

1. Inspect:
G
Driven coupling
G
Driven coupling damper
Damage/wear → Replace.

Bearing installation

1. Install:
Circlip (rear)
G
2. Install:
Bearing
G
Driver rod:
YB-06071/90890-06606
Bearing outer race attachment:
YB-06156/90890-06626
NOTE:
Support the intermediate housing with
steel blocks 1 and press the bearing.
6-24
E

Publicidad

Capítulos

loading