Descargar Imprimir esta página

Installing Power Unit - TOHATSU EverRu MX 18E2 Manual De Servicio

Publicidad

Idiomas disponibles

Idiomas disponibles

Power Unit
5910
5910
5-80

35) Installing Power Unit

1.
Clean mating faces of engine base and cylinder ass'y, and
then, attach dowel pins 1 gasket 2. Apply Loctite 5910 to
engine basement.
2.
Install power unit securely, and tighten engine mount bolts
3 specified torque.
2
1
3.
Install other parts reverse of their removing steps.
3
3
Use new engine base gasket.
Engine Mount Bolts 3 :
25 N · m (18 lb · ft) [2.5 kgf · m]
Be careful not to catch wires and hoses and other
parts between engine base mating surfaces.
After installing power unit, make sure to check
and adjust throttle cable.
GB
2st X18E2 2012

Publicidad

Capítulos

loading