20. Remove the fifth driven gear synchronizer sleeve and the synchronizer gear using the bearing puller J-22888-
20. Remove the fifth driven gear synchronizer sleeve and the synchronizer gear using the bearing puller J-22888-
20-A with the puller legs J-22888-35.
21. Remove the mainshaft-driven fifth-gear assembly.
21. Remove the mainshaft-driven fifth-gear assembly.