JET
PUMP
JET PUMP UNIT
EXPLODED DIAGRAM
14 N • m (1.4 kgf • m, 10 ft • Ib)
8 × 24 mm
40 N • m (4.0 kgf • m, 29 ft • Ib)
10 × 95 mm
14
15
4
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
JET PUMP UNIT REMOVAL
1
Shift cable joint
2
QSTS cable joint
3
Bilge hose
4
Nut/washer
5
Steering cable joint
6
Clamp/spout hose
7
Bolt
JET PUMP UNIT
LT
LT
271
6.8 N • m (0.68 kgf • m, 4.9 ft • Ib)
6 × 22 mm
2.2 N • m (0.22 kgf • m, 1.6 ft • Ib)
2
LT
LT
572
572
13
4
6.8 N • m (0.68 kgf • m, 4.9 ft • Ib)
M M
Q'ty
Follow the left "Step" for removal.
1
1
1
NOTE:
Route the speed sensor lead between the
jet pump unit and the bilge hose.
1/2
1
1/1
6
6-4
9
5
LT
242
4
12
11
10
3
LT
LT
4
572
572
6 × 80 mm
7.8 N • m (0.78 kgf • m, 5.6 ft • Ib)
Service points
E
7
8
6
A A
1