–
+
ELEC
IGNITION SYSTEM
2. Measure:
• Pulser coil output peak voltage
Below specification → Replace the
pulser coil.
Test harness (3 pins):
YB-06791/90890-06791
Pulser coil output peak voltage:
White (W) – Black (B)
Red (R) – Black (B)
Unloaded
r/min
Cranking
V
4
NOTE:
To crank the engine, connect the engine shut-
off cord (lanyard), and then press the start
switch and engine stop switch simultaneously.
3. Measure:
• Lighting coil output peak voltage
Below specification → Replace the light-
ing coil.
Test harness (3 pins):
YB-06770/90890-06770
Lighting coil output peak voltage:
Green (G) – Green (G)
Unloaded
r/min
Cranking
V
9
NOTE:
To crank the engine, connect the engine shut-
off cord (lanyard), and then press the start
switch and engine stop switch simultaneously.
7-18
E
Loaded
2,000
3,500
4
23
38
Loaded
2,000
3,500
8
11
12