HULL
HOOD
DECK AND HULL
EXPLODED DIAGRAM
13 N • m (1.3 kgf • m, 9.4 ft • Ib)
18
5.4 N • m (0.54 kgf • m, 3.9 ft • Ib)
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
DECK AND HULL DISASSEMBLY
1
Nut
2
Spout
3
Nut
4
Cleat
5
Plate
6
Bolt
7
Sponson
8
Nut/washer
9
Screw/washer
10
Drain plug
DECK AND HULL
5.4 N • m (0.54 kgf • m, 3.9 ft • Ib)
LT
16
271
8
5 × 25 mm
2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
17
15 N • m (1.5 kgf • m, 11 ft • Ib)
5
4
12
2
1
11
10
9
Q'ty
Follow the left "Step" for disassembly.
1
1
2
1
2
10
2
4/4
4/4
2
8-47
5.4 N • m (0.54 kgf • m, 3.9 ft • Ib)
6 × 22 mm
16 N • m (1.6 kgf • m, 12 ft • Ib)
8 × 35 mm
3
5
13
15
14
13
15 N • m (1.5 kgf • m, 11 ft • Ib)
Service points
E
7
6