Engine Unit; Removal And Installation Chart - Yamaha WaveRunner FX140 Manual De Servicio

Ocultar thumbs Ver también para WaveRunner FX140:
Tabla de contenido

Publicidad

POWR

ENGINE UNIT

EXPLODED DIAGRAM
17 N • m (1.7 kgf • m, 12 ft • Ib)
LT
LT
271
9

REMOVAL AND INSTALLATION CHART

Step
Procedure/Part name
ENGINE UNIT REMOVAL
Engine oil
Service lid 1
Battery negative and positive lead
Throttle cable and fuel hose
Water lock and exhaust joint
1
Oil filter
2
Bolt
ENGINE UNIT
15
8 × 40 mm
13
14
7.8 N • m (0.78 kgf • m, 5.6 ft • Ib)
6 × 25 mm
11
4
12
LT
LT
572
10
3
5
9
17 N • m (1.7 kgf • m, 12 ft • Ib)
Q'ty
Follow the left "Step" for removal.
Drain.
Refer to "POWER UNIT" in Chapter 3.
Refer to "FRONT HOOD" in Chapter 8.
Refer to "ELECTRICAL BOX AND
IGNITION COIL BOX" in Chapter 7.
Refer to "FUEL INJECTION SYSTEM" in
Chapter 4.
Refer to "EXHAUST SYSTEM" in Chapter 8.
1
4
5-1
6
17 N • m (1.7 kgf • m, 12 ft • Ib)
8 × 28 mm
7
2
LT
LT
572
9
8
1
Service points
E

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido