Descargar Imprimir esta página

Actuator And Cables Assembly; Instalacion Accionador Y Cables - APRILIA RS 250 Manual De Taller

Ocultar thumbs Ver también para RS 250:

Publicidad

ENGINE
Install the ends of the spring into the hole
in the oil pump pulley and hole
tuator pulley.
Set the groove
0C0
in the oil pump pulley to the
lug
0D0
on the actuator pulley.
® N° 221 on the fastening screw
Apply LOCTITE
and tighten.
Pulley screw tightening torque:
4 – 6 Nm (0,4 – 0,6 kgm)

ACTUATOR AND CABLES ASSEMBLY

Connect all the cables to the actuator pulley
050
properly.
Cable
010
Cable
020
Cable
030
Cable
040
Oil pump cable
Install the actuator assembly
parts holder.
With the actuator mounted, install the electric
part holder
050
on the frame.
Install the thermostat case 040.
MOTOR
0A0
0B0
in the ac-
Par de apriete del tornillo de la polea:
4 – 6 Nm (0,4 – 0,6 kgm)

INSTALACION ACCIONADOR Y CABLES

L = 230 mm
L = 220 mm
L = 580 mm
L = 530 mm
060
to the electric
Introducir las extremidades del resorte en el
orificio
0A0
sobre la polea de la bomba de acei-
te y en el orificio
0B0
sobre la polea del accio-
nador.
Alinear la ranura
0C0
sobre la polea de la bom-
ba de aceite con la espiga
del accionador.
Aplicar LOCTITE ® N° 221 sobre el tornillo de
fijación y apretarlo.
Conectar correctamente todos los cables a la
polea
050
del accionador.
Cable
010
Cable
020
Cable
030
Cable
040
Cable de la bomba del aceite
Instalar el grupo accionador
de los componentes eléctricos.
Con el accionador montado, instalar la placa
050
sobre el chasis.
Instalar el cuerpo
040
del termóstato.
3 - 22
0D0
sobre la polea
L = 230 mm
L = 220 mm
L = 580 mm
L = 530 mm
060
sobre la placa

Publicidad

Capítulos

loading

Este manual también es adecuado para:

945w