EXFO FTB-8510B Guia Del Usuario página 728

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Creating and Starting a Test Case
Typical Test Cases
4. Press Finish to complete the test setup.
The DS1 Loopback function is now operational; no need to start the
test. However, the test may be started to monitor the condition of the
DS1 line connection to that test equipment.
5. For additional configuration parameters and results, refer to Summary
Tabs on page 125, Port Tabs on page 137, and DSn Tabs on page 269.
6. For additional configuration parameters and results, refer to the
following chapters: Summary, Port, and DSn tabs.
7. Press the Start button to start the test. Refer to Global Test Status and
Controls on page 35 for more information on test management.
78
FTB-8100 Series Transport Blazer

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ftb-8510gFtb-8525Ftb-8535Ftb-8120nceFtb-8103nce

Tabla de contenido