EXFO FTB-8510B Guia Del Usuario página 731

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Select the test
path/mapping.
4a. From the data path
4b. Press a timeslot from the Grid tab when applicable.
4c. For STS/STM and VT/AU mapping level, select
4d. For DSn/PDH mapping level,
4e. For Pattern, go to step 5.
4f. Press Next or Finish.
4g. Repeat step 4 as required to complete the path/mapping. See
SONET/SDH Application
selector, press the
desired
path/mapping.
Choices depend on
the selected
interface. See
Supported
Paths/Mappings on
page 59 for more
information.
the Enable TCM check box if needed.
select the Framing. For more
information, refer to DSn Tabs or
PDH Tabs.
For DS3, select the Enable FEAC
check box to allow far end alarm and control testing.
For DS1, select the Enable FDL check box to allow facility data
link testing.
For DS1/E1, select the Enable DS0/E0 check box to allow DS0 or
E0 testing.
Supported Paths/Mappings on page 59 for more information.
Creating and Starting a Test Case
Typical Test Cases
81

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ftb-8510gFtb-8525Ftb-8535Ftb-8120nceFtb-8103nce

Tabla de contenido