4. METER HARNESS A [EQUIPPED TYPE ONLY]
1
a. REMOVAL/INSTALLATION
1) Remove the six 5 x 12 mm screws, and remove the under cover from the tiller handle assembly.
2
2) Remove the grommet from the tiller handle assembly and remove the meter harness A from the grommet.
3) Remove the harness band clip that clamps the 40 mm cord tube from the connector bracket (P. 16-10).
3
4) Remove the 6 x 12 mm flange bolt from the connector bracket and remove the harness and the connector bracket as
a set from the tiller handle assembly (P. 16-11).
4
Remove the harness band clip, which clamps the tube A and meter harness A from the connector bracket (P. 16-11).
5) Open the harness band clip that clamps the 40 mm cord tube.
5
Replace the harness band clip with a new one on reassembly.
Remove all the connectors from the 40 mm cord tube and disconnect the four meter harness connectors.
6
6) Open the harness band clip that clamps the tube A and meter harness A.
7
Replace the harness band clip with a new one on reassembly.
Installation is the reverse order of removal.
8
[1]
9
5 x 12 mm SCREW (6)
9.5 N . m (1.0 kgf . m, 7.0 lbf . ft)
10
11
12
13
14
15
[15]
UNDER COVER
16
17
18
19
20
[14]
TILLER HANDLE
ASSEMBLY
16-38
[2]
METER HARNESS A
INSTALLATION HOLE
[9]
[13]
HARNESS
40 mm CORD TUBE
BAND CLIP
634
[3]
[4]
HANDLE CABLE
GROMMET
INSTALLATION
HOLE
[5]
REMOTE CONTROL
CABLE [SHIFT SIDE]
INSTALLATION
HOLE
[7]
[6]
<VIEWED FROM
REMOTE CONTROL
THE OUTBOARD
CABLE [THROTTLE
MOTOR SIDE>
SIDE] INSTALLATION
HOLE
[10]
HANDLE CABLE
[11]
METER HARNESS A
[12]
METER HARNESS
CONNECTORS
[8]
TUBE A
[9]
HARNESS
BAND CLIP